eu job search

SHUTTERER

€1,500.00 - €1,846.00 month

  • FULL TIME
  • HAZ-ZEBBUG, MALTA
  • FULL DAY
  • 16 November 2026
  • Ref: 457887

To build, install, and remove the temporary molds (formwork) used to shape and support poured concrete until it sets.

• Interpreting Blueprints: Reading and analyzing architectural and engineering drawings to understand the exact dimensions, shapes, and structural requirements of the concrete to be poured. • Selecting and Preparing Materials: Choosing the right materials for the job—typically timber, plywood, heavy-duty plastics, or prefabricated steel and aluminum systems. • Constructing and Assembling Formwork: Cutting, shaping, and erecting the temporary molds (shuttering) for walls, columns, beams, slabs, staircases, and foundations. • Securing and Bracing: Installing tie rods, anchors, stays, and props to ensure the formwork remains perfectly level, square, and sturdy enough to withstand the immense pressure of heavy, wet concrete. • Striking (Dismantling): Carefully removing the shuttering structures once the concrete has reached the required strength, ensuring the newly formed concrete is not damaged during the process. • Maintenance and Safety: Cleaning, repairing, and preparing the reusable formwork panels for the next project while strictly adhering to on-site health and safety regulations

  • Profiles

  • Competencies

    • Clear, dig up or raise site or construction
    • Unload and store materials manually in storage areas
    • Finish and repoint surfaces
    • Make/mix products (mortar, filler, glue...)
    • Arrange storage areas for equipment and building materials
    • Prepare equipment and gear, secure the work area
    • Demolish a construction by means of machine
  • Past Experience

    • Occupation
      Experience(months)
    • LABOURER, BUILDING CONSTRUCTION
      12
  • Driving Licences

    No Driving Licenses required for this vacancy

Apply   Change View

Need some guidance?

Make use of our knowledge base to achieve your career goals